This website uses cookies to ensure you get the best experience on our website.
Learn more
GOT IT!
Skip to main content (Press Enter).
Login to see members only content
Skip auxiliary navigation (Press Enter).
SME
UCA
Skip main navigation (Press Enter).
Toggle navigation
Home
About the UCA YM
Underground Construction Association - The Organization
UCA Young Members - Mission and Focus
Meet the UCA YM
Events
Our Events
National Calendar
Past Webinars
Participate
Share a File
Post a Message
Find a Member
Search the Library
Discussions
Tunnel Vision Series
Blog Viewer
Great time-lapse video of the dissassembly of two TBMs through the retrieval shaft at San Francisco Central Subway line
Like
The video shows TBM Mom Chung breaking into the water-filled retrieval shaft last June. The water is drained from the shaft for the arrival of TBM Big Alma. The departure of the machines comes next as workers
remove both TBMs
, piece by piece, over several months. The retrieval shaft site was restored and vacated in January 2015.
This video was created by: http://www.centralsubwayblog.com/blog/2015/02/tunnel-boring-machines-disassembly/
0 comments
106 views
Permalink
https://community.smenet.org/ucaym/blogs/heather-gravning/2015/03/24/great-time-lapse-video-of-the-dissassembly-of-two-tbms-through-the-retrieval-shaft-at-san-francisco-central-subway-line
Tag
Code of Conduct
© 2022 UCA All Rights Reserved. UCA is a member society of OneTunnel, the SME Foundation, and the American Institute of Mining, Metallurgical, and Petroleum Engineers (AIME).
Powered by Higher Logic
×
Group Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :